Skip to main content

Engineering Division plans

 Series
Identifier: 5020.001

Scope and Contents

Engineering Department and Public Works Department, Highway Division plans for streets, retaining walls, sea walls, edgestones, etc. Includes two sets of plans: OB# plans and OC# plans.

Dates

  • circa 1892-1960

Creator

Biographical / Historical

The Office of City Engineer was established by ordinance passed on October 31, 1850. By Chapter 449 of the Acts of 1895, the Surveying Department and the Office of City Surveyor was abolished and the duties transferred to the Engineering Department and the Office of City Engineer. By Chapter 9 of the Ordinances of 1910, the power and duties of the Engineering Department were absorbed by the newly created Public Works Department. A Survey Division of the Public Works Department was established May 1, 1954, under Chapter 2 of the Ordinances of 1954, Section 56, which amended Section 33 of Chapter 27 of the Revised Ordinances of 1947. The division performed certain engineering services for the divisions of the Public Works Department and other City departments. It also performed administrative and engineering services required by the Public Improvement Commission. On March 15-16, 1960, the functions and employees of the Bridge, Highway, Water, and Sewer Divisions engaged in engineering design were transferred to the Survey Division. The Survey Division was renamed the Engineering Division in 1961.

Extent

14 flat file drawers

Language of Materials

English

  • Public works Subject Source: Library of Congress Subject Headings
  • Streets Subject Source: Library of Congress Subject Headings
Language of description
Undetermined
Script of description
Code for undetermined script

Repository Details

Part of the City of Boston Archives Repository

Contact:
201 Rivermoor St.
West Roxbury MA 02132 United States
617-635-1195
617-635-1194 (Fax)